Go Back
#{{srno}}{{('/' + prno) if prno }}

LTA for Eight (8) Slipover Platforms with Associated P/Ls & Cables

Theme
Offshore
Client
Saudi Aramco
Country
Saudi Arabia
Status
Completed, 2018 to 2021
Contract Type
EPC
Contract Value
394.62
Scope of Work

Engineering, Procurement, Fabrication, Transportation, Installation, Hookup and Pre-commissioning in SFNY field of:

  • 8 Slipover jackets and decks in Central SFNY field which require demolition of the existing jacket and topsides.
  • Installation of subsea infrastructure: 6 valve skids, 3 Rigid pipelines, 3 New Fiexibies, 6 umbilicals, 8 cables.
  • Disconnection and reconnection of facilities to subsea infrastructure (SFNY-210 and SFNY-107) 2 lateral Flexible flow lines & 2 umbilicals
  • Demolition of all the existing wellhead platform jackets and decks and existing pipeline demolition where required